Configure reference date for offerings availability
In the base configuration, offerings availability uses the
written date as the reference date. You can change the reference date to effective date by
modifying the UsePolicyPeriodReferenceDateForOfferingAvailability
configuration parameter. If reference date is set to effective date, the date range is the
start and end dates of the policy period associated with the policy transaction (job).
See also
